MAPEI Topcem Pronto
link to this page:
https://www.baubook.at/m/PHP/Info.php?SI=2142686633&SW=16&lng=2

Manufacturer
Mapei Austria GmbH
A-3134 Nußdorf ob der Traisen
Austria
 
Description
Product groups: Cement screeds
Area of application (screeds):
  • Floating screed
  • Sliding screed
  • Composite screed
  • Heating screed
  • Spaces with enhanced exposure to humidity
  • Terraces/balconies
Product photos:
 
Criteria for certification, tendering and subsidies
List of Criteria 2020

The criteria is relevant and the product supports the fulfillment of the criterion.
 
Technical characteristics
Physical parameters
Serviceability
 
Processing properties
Installation (description): not specified
Material consumption: 18–20 kg/m²/cm Schichtdicke, je nach Verdichtungsgrad. Genauere Angaben entnehmen Sie bitte dem aktuellen technischen Datenblatt, abrufbar unter www.mapei.at.
Mixing ratio (water: powder): 1 : 25water: powder
Walk on time (… hours): 12h
 
raw materials and input materials
Ingredients
SVHC (Substances of Very High Concern): The final product ready for sale does not contain any substance of very high concern (SVHC) of the candidate list
 
Life Cycle Assessment (LCA)
Reference value
Life Cycle Assessment data according to EN 15804+A1 ecoinvent (Austrian-compliant)
A1-A3 Product stage
indicator
reference Unit
Core environmental impact indicators
GWP-fossil Global warming potential - fossil 0,151 kg CO2 Äq./kg
GWP-biogenic Global warming potential - biogenic 0,00 kg CO2 Äq./kg
GWP-total Global warming potential - total 0,151 kg CO2 Äq./kg
ODP Depletion potential of the stratospheric ozone layer 4,85·10-9 kg CFC-11 eq./kg
AP Acidification potential 0,000315 kg SO2 Äq./kg
EP Eutrophication potential 0,000204 kg PO43- eq./kg
POCP Photochemical Ozone Creation Potential 4,82·10-5 kg C2H4 eq./kg
Indicators describing resource use
PERE Primary energy renewable - energy resources 0,124 MJ/kg
PERM Primary energy renewable - material 0,00 MJ/kg
PERT Primary energy renewable - total 0,124 MJ/kg
PENRE Primary energy non-renewable - energy resources 1,34 MJ/kg
PENRM Primary energy non-renewable - material 0,00 MJ/kg
PENRT Primary energy non-renewable - total 1,34 MJ/kg
Quelle: IBO reference values 2020, ab 17.2.2023
 
 
Service area
CE marking
CE marking: yes
CE Declaration of Performance:
issued on July 1, 2013
 
Ecolabels
EMICODE EC 1<sup>PLUS</sup>
PDF (407 KB)
issued on Nov 26, 2025
valid until November 2030
 
Download
Technical data sheet:
issued on July 1, 2023
Safety data sheet:
issued on Aug 16, 2022
Other environmental product declarations (non-compliant):
EPD declaration (1,34 MB)
valid until Feb 8, 2029
 
baubook declaration
declared since: Apr 10, 2006
Amended: July 13, 2026
baubook product index: 3041 al
Current: recently updated
version history: öffnen
 
EcoBuildingCriteria
Harmonised “EcoBuildingCriteria” provided by “ÖkoKauf Wien” and “service package sustainable construction in Vorarlberg”
print page
share this page