MAPEI Mapeform Eco Oil E
link to this page:
https://www.baubook.at/m/PHP/Info.php?SI=2142739528&SW=16&lng=2

Manufacturer
Mapei Austria GmbH
A-3134 Nußdorf ob der Traisen
Austria
 
Description
Product groups: Releasing agent
 
Criteria for certification, tendering and subsidies
List of Criteria 2020

The criteria is relevant and the product supports the fulfillment of the criterion.
 
Technical characteristics
Physical parameters
ρ density: not specifiedkg/m³
c specific heat capacity: not specifiedJ/(kg·K)
 
Processing properties
Installation (description): not specified
Consumption per procedure (l/m²): 0,014l/m²
Number of procedures required: 1
 
raw materials and input materials
Summary by type of raw material
composition by raw material type
85 Gew% Proportion of renewable raw materials (excluding plastics) mehr
N/A Proportion of renewable raw materials in plastics mehr
N/A Proportion of mineral raw materials (except metals) mehr
N/A Proportion of metallic raw materials mehr
N/A Proportion of fossil raw materials in plastics mehr
N/A Proportion of fossil raw materials in bitumen mehr
N/A Proportion of fossil raw materials in chemicals mehr
N/A Water as a recipe ingredient (plant)
N/A Water as a formulation component (construction site)
15 Gew% Proportion not declared
 
Ingredients
SVHC (Substances of Very High Concern): The final product ready for sale does not contain any substance of very high concern (SVHC) of the candidate list
Halogen-organic compounds: 0w%
VOC (g/l): 0g/l
 
Service area
CE marking
CE marking: not specified
 
GHS hazard statement, warnings, hazard classes
Water pollution class:
1
 
GISCODE
GISBAU Product code for concrete release agents:
BTM 10 Concrete release agents, unmarked
 
Download
Technical data sheet:
Safety data sheet:
issued on May 26, 2025
 
baubook declaration
declared since: July 31, 2023
Amended: Aug 28, 2025
baubook product index: 3041 fd
version history: öffnen
 
EcoBuildingCriteria
Harmonised “EcoBuildingCriteria” provided by “ÖkoKauf Wien” and “service package sustainable construction in Vorarlberg”
print page
share this page